Maleo and Peluang (Madura Offshore PSC)

Maleo and Peluang fields, located in 57 metres of water offshore East Java, Indonesia.

Producing

Participants

Santos (67.5% and operator), PC Madura Ltd (22.5%), PT Petrogas Pantai Madura (10%).

First Production

Gas production from Maleo commenced in October 2006. All of the gas produced from Maleo is sold to PT Perusahaan Gas Negara.

Gas production from Peluang commenced in March 2014, with the gas sold to domestic users in East Java.

About the Development

Gas from the Maleo field is produced from the Maleo Producer Platform (MPP) supported by a six-well wellhead platform which is connected to the East Java Gas Pipeline for distribution to the Surabaya and Gresik gas grid.

Peluang was developed as a tie back to the existing facilities at Maleo, and includes  one horizontal gas well, a minimum facility stand-alone wellhead platform and a pipeline to the Maleo platform.