You are using an outdated browser. Please upgrade your browser to improve your experience.
Skip to content
Barossa Gas Project: Learn more

Media enquiries Investor enquiries
Matthew Doman Andrew Nairn
+61 8 8116 5260 / +61 (0) 421 888 858 +61 8 8116 5314 / +61 (0) 437 166 497
matthew.doman@santos.com andrew.nairn@santos.com

Santos advises that production has recommenced at the Mutineer-Exeter oil fields following the successful completion of electrical repairs on the FPSO.

Forward production is expected to achieve 20,000 to 22,000 barrels of oil per day gross, in line with previous guidance.

Mutineer-Exeter was shut-down for temporary repairs in early February 2008 following electrical damage which rendered the sub-sea pumps inoperable. Full electrical repairs are expected to be completed in 2009.

A workover programme on Mutineer-Exeter will commence in the second quarter of 2008 to further enhance production from the fields.

Interests in the Mutineer-Exeter oil fields are:

Santos (Operator) 33.4%
Kufpec 33.4%
Nippon Oil 25.0%
Woodside Petroleum 8.2%