| Well Name / Santos Interest | Type | Location | Latitude / Longitude | Water Depth / Ground Level | Rotary Table Elevation | Rig Name | Spud Date | Rig Release Date / TD / Result |
RM08-11 4 30.0% | CSG Development | PL314 Bowen Basin |
26°26'17.6"S
148°59'46.5"E
|
GL 381.2m
|
385.4m
| Lucas 26 | 15/04/12 |
25/04/2012
1194m C&S CSG
|
101-CB 1X 27.5% | Oil Exploration | Block 101, Beibuan/Hai Phong Basin, Vietnam |
20°22'59.5"N
108°5'54.7"E
|
WD 49m
|
37.2m
| Aquamarine Driller | 02/08/11 |
In progress
|
12W-CS N17XP 31.88% | Oil Appraisal | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.4"N
108°17'48.8"E
|
WD 95.5m
|
42.2m
| Ensco 107 | 15/04/12 |
In progress
|
12W-CS N1PST1 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95m
|
42.2m
| Ensco 107 | 15/05/11 |
In progress
|
12W-CS N2P 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95.5m
|
36.4m
| Ensco 107 | 25/07/10 |
In progress
|
12W-CS N4I 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95m
|
42.2m
| Ensco 107 | 19/05/11 |
In progress
|
12W-CS N5I 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95.5m
|
42.2m
| Ensco 107 | 10/08/10 |
In progress
|
12W-CS S10P 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95.5m
|
36.4m
| Ensco 107 | 12/07/10 |
In progress
4005m
|
12W-CS S11P 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95m
|
42.2m
| Ensco 107 | 31/05/11 |
In progress
|
12W-CS S12I 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95.5m
|
42.2m
| Ensco 107 | 03/08/10 |
In progress
|
12W-CS S13IST1 37.5% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.4"N
108°17'49"E
|
WD 95.5m
|
36.4m
| Ensco 107 | 01/07/10 |
In progress
|
12W-CS S14I 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95.5m
|
36.4m
| Ensco 107 | 16/07/10 |
In progress
|
12W-CS S15I 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95m
|
42.2m
| Ensco 107 | 23/05/11 |
In progress
|
12W-CS S16P 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'48.9"E
|
WD 95.5m
|
42.2m
| Ensco 107 | 12/04/12 |
In progress
|
12W-CS S6P 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.3"N
108°17'48.8"E
|
WD 95.5m
|
42.2m
| Ensco 107 | 20/03/11 |
In progress
3968m
|
12W-CS S7P 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95.5m
|
36.4m
| Ensco 107 | 08/07/10 |
In progress
|
12W-CS S8P 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'48.9"E
|
WD 95.5m
|
42.2m
| Ensco 107 | 21/07/10 |
In progress
|
12W-CS S9P 31.88% | Oil Development | Block 12W, Nam Con Son Basin, Offshore Vietnam |
7°19'57.2"N
108°17'49.1"E
|
WD 95m
|
42.2m
| Ensco 107 | 27/05/11 |
In progress
|
Arcadia Branch 5 23.85% | CSG Appraisal Pilot | ATP526P Bowen Basin |
25°17'29.5"S
148°55'42"E
|
GL 417.4m
|
421.5m
| EWG 102 | 13/05/12 |
In progress
960m
|
Bayu Undan W06ST1 11.40% | Gas Development | JPDA03-13, Offshore NT, Bayu Undan |
11°4'24.6"S
126°40'54"E
|
WD 78.3m
|
44.0m
| Ensco 104 JU | 11/11/09 |
In progress
4100m
|
Beam 1 45% | Gas Appraisal | WA-13-L, Carnarvon Basin |
20°41'12.8"S
115°1'53.2"E
|
WD 92.0m
|
25.0m
| Ensco 104 | 22/02/12 |
In progress
|
Brolga Downs 1 30.00% | CSG Appraisal Corehole | ATP803P Bowen Basin |
25°46'6.6"S
149°38'54.1"E
|
GL 214.4m
|
218.6m
| EWG 101 | 28/03/12 |
04/04/2012
328m C&S CSG
|
Bullamakanka 1 70.0% | Oil Near Field Exploration | ATP259P Eromanga/Cooper Basin |
27°24'59.1"S
141°4'55.2"E
|
GL 326.3'
|
343.3'
| Saxon 184 | 20/02/12 |
28/03/2012
6740' P&A
|
Charo 10 66.60% | Oil Appraisal | PPL177 Cooper Basin |
27°26'39.7"S
139°42'58.9"E
|
GL 107.8'
|
124.8'
| Saxon 182 | 18/03/12 |
28/03/2012
6276' C&S oil well
|
Charo 11 66.60% | Oil Development | PPL177 Cooper Basin |
27°26'48.1"S
139°43'32.4"E
|
GL 86'
|
103.5'
| Saxon 182 | 03/04/12 |
11/04/2012
6327' C&S oil well
|
Charo 12 66.60% | Oil Development | PPL177 Cooper Basin |
27°26'47.7"S
139°43'32.3"E
|
GL 86'
|
103'
| Saxon 182 | 13/04/12 |
22/04/2012
6482' C&S oil well
|
Charo 13 66.60% | Oil Development | PPL177 Cooper Basin |
27°26'47.3"S
139°43'32.2"E
|
GL 86'
|
103'
| Saxon 182 | 23/04/12 |
05/05/2012
6328' C&S oil well
|
Charo 14 66.60% | Oil Appraisal | PPL177 Cooper Basin |
27°26'43"S
139°44'12.9"E
|
GL 75.4'
|
92.6'
| Saxon 182 | 09/05/12 |
In progress
6177'
|
Charo 8 66.60% | Oil Development | PPL177 Cooper Basin |
27°26'7.8"S
139°43'.8"E
|
GL 79.3'
|
96.3'
| Saxon 182 | 09/02/12 |
18/02/2012
6175' C&S oil well
|
Charo 9 66.60% | Oil Development | PPL177 Cooper Basin |
27°26'17.6"S
139°42'54.7"E
|
GL 139.4'
|
156.4'
| Saxon 182 | 22/02/12 |
07/03/2012
6221' C&S oil well
|
Cook 20 55.0% | Oil Appraisal | PL97 Eromanga/Cooper Basin |
26°41'42"S
141°16'40.7"E
|
GL 386.1'
|
403.1'
| Saxon 184 | 03/04/12 |
13/04/2012
6706' C&S oil well
|
Cook 21 55.0% | Oil Development | PL97 Eromanga/Cooper Basin |
26°40'52.5"S
141°16'57.1"E
|
GL 385.3'
|
402.3'
| Saxon 184 | 15/04/12 |
23/04/2012
6701' C&S oil well
|
Cook 22 55.0% | Oil Appraisal | PL97 Eromanga/Cooper Basin |
26°41'4.4"S
141°16'41.8"E
|
GL 383.7'
|
400.7''
| Saxon 184 | 25/04/12 |
04/05/2012
6726' P&A
|
Cook 23 55.0% | Oil Appraisal | PL97 Eromanga/Cooper Basin |
26°40'35.9"S
141°16'54.5"E
|
GL 389.7'
|
406.7''
| Saxon 184 | 07/05/12 |
In progress
6684'
|
Coolangatta 2 50.0% | Oil Appraisal | ATP633P Cooper Basin |
28°28'9.3"S
141°22'10.1"E
|
GL 135m
|
140m
| Ensign 18 | 05/02/12 |
15/02/2012
1371m P&A
|
Durham Downs 5 60.06% | Gas Development | PL80 Eromanga/Cooper Basin |
27°7'48.8"S
141°47'22"E
|
GL 324.9'
|
341.9'
| Saxon 184 | 08/01/12 |
26/01/2012
9004' C&S gas well
|
Durham Downs North 3 60.06% | Gas Development | PL80 Eromanga/Cooper Basin |
27°2'29.3"S
141°49'37"E
|
GL 310.9'
|
327.9'
| Saxon 184 | 02/02/12 |
16/02/2012
8764' C&S gas well
|
Fairview 524 23.85% | CSG Development | PL232 Bowen Basin |
25°39'7.3"S
149°2'20.6"E
|
GL 493.8m
|
497.8m
| Lucas 85 | 09/01/12 |
23/01/2012
1307m C&S CSG
|
FV11-36 2 23.85% | CSG Development | PL92 Bowen Basin |
25°44'22.6"S
148°56'3.5"E
|
GL 388.1m
|
392.1m
| EWG 103 | 06/05/12 |
In progress
|
FV11-36 3 23.85% | CSG Development | PL92 Bowen Basin |
25°44'22.8"S
148°56'3.3"E
|
GL 388m
|
392m
| EWG 103 | 22/04/12 |
05/05/2012
876.5m C&S CSG
|
FV12-23 2 23.85% | CSG Development | PL100 Bowen Basin |
25°44'19.6"S
149°0'54"E
|
GL 321.1m
|
325.1m
| EWG 103 | 01/01/12 |
17/04/2012
1454m C&S CSG
|
FV12-23 3 23.85% | CSG Development | PL100 Bowen Basin |
25°44'19.8"S
149°0'54.3"E
|
GL 321.1m
|
325.1m
| EWG 103 | 06/01/12 |
09/04/2012
1330m C&S CSG
|
FV12-23 4 23.85% | CSG Development | PL100 Bowen Basin |
25°44'20"S
149°0'54.5"E
|
GL 321.3m
|
325.3m
| EWG 103 | 10/01/12 |
16/01/2012
738.5m suspended for further deepening
|
FV12-23 4ST1 23.85% | CSG Development | PL100 Bowen Basin |
25°44'20"S
149°0'54.5"E
|
GL 321.3m
|
325.3m
| EWG 103 | 14/03/12 |
30/03/2012
1205m C&S CSG
|
FV12-23 5 23.85% | CSG Development | PL100 Bowen Basin |
25°44'20.2"S
149°0'54.7"E
|
GL 321.5m
|
325.5m
| EWG 103 | 18/01/12 |
12/03/2012
1604.5m C&S CSG
|
FV12-27 1 23.85% | CSG Development | PL100 Bowen Basin |
25°44'40.8"S
149°4'59.6"E
|
GL 345m
|
349.1m
| Ensign 50 | 14/01/12 |
23/01/2012
1244.1m suspended for further deepening
|
FV12-27 2 23.85% | CSG Development | PL100 Bowen Basin |
25°44'41"S
149°4'59.4"E
|
GL 344.9m
|
349.1m
| Ensign 50 | 10/02/12 |
17/02/2012
1410m C&S CSG
|
FV15-19 1 23.85% | CSG Development | PL99 Bowen Basin |
25°49'47.5"S
148°52'56.6"E
|
GL 346.8m
|
350.8m
| EWG 101 | 14/03/12 |
17/03/2012
270m suspended for further deepening
|
FV15-20 1 23.85% | CSG Development | PL99 Bowen Basin |
25°49'36.5"S
148°53'37.3"E
|
GL 379.6m
|
383.8m
| EWG 101 | 09/03/12 |
12/03/2012
394m suspended for further deepening
|
FV16-46 1 23.85% | CSG Development | PL99 Bowen Basin |
25°49'18.8"S
148°55'34.3"E
|
GL 382.9m
|
386.9m
| EWG 102 | 04/03/12 |
12/03/2012
332m P&A junked
|
FV16-46 1A 23.85% | CSG Development | PL99 Bowen Basin |
25°49'18.9"S
148°55'34.6"E
|
GL 382.8m
|
386.8m
| EWG 102 | 14/03/12 |
26/04/2012
618.3m C&S CSG
|
FV17-07 1 23.85% | CSG Development | PL100 Bowen Basin |
25°45'50"S
149°3'14.4"E
|
GL 372.4m
|
376.5m
| Ensign 50 | 22/02/12 |
28/02/2012
607m C&S CSG
|
FV17-07 2 23.85% | CSG Development | PL100 Bowen Basin |
25°45'50.2"S
149°3'14.3"E
|
GL 372.4m
|
376.7m
| Ensign 50 | 29/02/12 |
10/03/2012
1435m C&S CSG
|
FV17-07 3 23.85% | CSG Development | PL100 Bowen Basin |
25°45'50.5"S
149°3'14.2"E
|
GL 372.4m
|
376.7m
| Ensign 50 | 11/03/12 |
19/03/2012
1312m C&S CSG
|
FV18-01 1 23.85% | CSG Development | PL100 Bowen Basin |
25°45'15.2"S
149°5'25.5"E
|
GL 335.3m
|
339.3m
| EWG 102 | 12/02/12 |
22/02/2012
1563m C&S CSG
|
FV18-01 2 23.85% | CSG Development | PL100 Bowen Basin |
25°45'15.3"S
149°5'25.2"E
|
GL 335.3m
|
339.3m
| EWG 102 | 16/01/12 |
25/01/2012
1130m C&S CSG
|
Hillyvale 4 23.85% | CSG Appraisal | PL234 Bowen Basin |
25°26'40"S
148°51'41"E
|
GL 381.6m
|
385.8m
| EWG 101 | 25/04/12 |
01/05/2012
519m C&S CSG
|
Kia Ora West 5 50% | CSG Appraisal Pilot | ATP337P Bowen Basin |
25°40'47.8"S
148°36'50.3"E
|
GL 454.1m
|
458.1m
| EWG 102 | 16/04/12 |
22/04/2012
946m C&S CSG
|
Kia Ora West 6 50% | CSG Appraisal Pilot | ATP337P Bowen Basin |
25°40'56.6"S
148°36'34.9"E
|
GL 436.1m
|
440.1m
| EWG 102 | 24/04/12 |
09/05/2012
1661m C&S CSG
|
Leleptian 4 66.60% | Gas Development | PPL238 Cooper Basin |
27°45'2.6"S
139°56'31.5"E
|
GL 92.2'
|
109.2'
| Saxon 182 | 09/01/12 |
04/02/2012
10329' C&S gas well
|
Moonah East 1 23.85% | CSG Appraisal Corehole | PL92 Bowen Basin |
25°43'15.7"S
148°54'13.5"E
|
GL 427m
|
431m
| EWG 101 | 06/05/12 |
In progress
|
Mount Bassett 2 30.00% | CSG Appraisal Corehole Observation well | PL13 Bowen Basin |
26°27'26.8"S
148°51'15.5"E
|
GL 366.7m
|
370.9m
| EWG 101 | 12/04/12 |
23/04/2012
703m C&S CSG
|
NE Sangu 1 100% | Gas Near Field Exploration | Block 16PSC, Sangu Gas Field, Tertiary Basin, Offshore Bangladesh |
22°2'44.5"N
91°32'47"E
|
WD 10.8m
|
32.8m
| Offshore Resolute | 24/11/11 |
In progress
|
Noosa 1 50.0% | Oil Near Field Exploration | ATP633P Cooper Basin |
28°28'12"S
141°23'19.1"E
|
GL 135m
|
140m
| Ensign 18 | 09/01/12 |
28/01/2012
1369m P&A
|
Oyong 11 45% | Oil Development | Sampang PSC, Offshore Indonesia, Madura Straits |
7°17'30.4"S
113°21'48.7"E
|
WD 41.0m
|
33.7m
| COSL BOSS | 13/01/12 |
In progress
|
Petrel 7 35.0% | Gas Appraisal | NT/RL1, Bonaparte Basin |
12°53'50"S
128°33'50"E
|
WD 94.0m
|
25.0m
| Stena Clyde | 02/08/11 |
In progress
|
Pleasant Hills 39I 30% | CSG Development Gas Injector Storage | PL314 Bowen Basin |
26°22'25.1"S
149°0'14"E
|
GL 405.4m
|
409.4m
| EWG 102 | 24/03/12 |
29/03/2012
1071m C&S Injector Well
|
Pleasant Hills 40I 30% | CSG Development Gas Injector Storage | PL314 Bowen Basin |
26°23'7.9"S
148°58'41.7"E
|
GL 442m
|
446m
| EWG 102 | 04/04/12 |
09/04/2012
1108m C&S Injector well
|
Ridgelands West 1 50% | CSG Appraisal Corehole | ATP337P Bowen Basin |
25°41'45.9"S
148°43'27.3"E
|
GL 553.8m
|
555.6m
| Lucas 94 | 22/01/12 |
06/03/2012
981m P&A
|
RM02-04 1 30.0% | CSG Development | PL309 Bowen Basin |
26°20'18.1"S
149°3'10.9"E
|
GL 400.4m
|
404.7m
| Ensign 58 | 04/05/12 |
10/05/2012
582.2m C&S CSG
|
RM02-20 1 30.0% | CSG Development | PL309 Bowen Basin |
26°21'39.3"S
149°1'21.5"E
|
GL 412.3m
|
416.3m
| Ensign 58 | 17/01/12 |
26/01/2012
640m C&S CSG
|
RM02-20 2 30.0% | CSG Development | PL309 Bowen Basin |
26°21'39.6"S
149°1'21.6"E
|
GL 412.1m
|
416.4m
| Ensign 58 | 16/02/12 |
28/02/2012
976m C&S CSG
|
RM02-27 1 30.0% | CSG Development | PL309 Bowen Basin |
26°22'21.3"S
149°1'23.6"E
|
GL 395m
|
399.3m
| Ensign 58 | 12/05/12 |
In progress
|
RM08-02 1 30.0% | CSG Development | PL314 Bowen Basin |
26°25'18.7"S
149°0'1.7"E
|
GL 398.3m
|
402.6m
| Ensign 58 | 16/04/12 |
22/04/2012
925m C&S CSG
|
RM08-02 2 30.0% | CSG Development | PL314 Bowen Basin |
26°25'18.5"S
149°0'1.5"E
|
GL 398.3m
|
402.3m
| Ensign 58 | 24/04/12 |
02/05/2012
1019.7m C&S CSG
|
RM08-07 1 30.0% | CSG Development | PL314 Bowen Basin |
26°25'36"S
149°2'11.1"E
|
GL 398.9m
|
403.2m
| Ensign 58 | 05/03/12 |
17/03/2012
865m C&S CSG
|
RM08-07 2 30.0% | CSG Development | PL314 Bowen Basin |
26°25'36.2"S
149°2'11.3"E
|
GL 399.1m
|
403.3m
| Ensign 58 | 19/03/12 |
25/03/2012
846m C&S CSG
|
RM08-07 3 30.0% | CSG Development | PL314 Bowen Basin |
26°25'36.3"S
149°2'11.6"E
|
GL 399.1m
|
402.8m
| Ensign 58 | 27/03/12 |
02/04/2012
858m C&S CSG
|
RM08-08 1 30.0% | CSG Development | PL314 Bowen Basin |
26°25'52.3"S
148°59'10.4"E
|
GL 392.4m
|
396.7m
| Ensign 50 | 07/05/12 |
12/05/2012
900m C&S CSG
|
RM08-08 2 30.0% | CSG Development | PL314 Bowen Basin |
26°25'52.2"S
148°59'10.1"E
|
GL 392.4m
|
396.7m
| Ensign 50 | 13/05/12 |
In progress
|
RM08-11 2 30.0% | CSG Development | PL314 Bowen Basin |
26°26'17.9"S
148°59'47"E
|
GL 381.1m
|
385.3m
| Lucas 26 | 16/05/12 |
In progress
|
RM08-11 3 30.0% | CSG Development | PL314 Bowen Basin |
26°26'17.8"S
148°59'46.7"E
|
GL 381.1m
|
385.3m
| Lucas 26 | 04/05/12 |
15/05/2012
1220m C&S CSG
|
RM12-06 1 30.0% | CSG Development | PL314 Bowen Basin |
26°28'18"S
149°2'7.6"E
|
GL 323.6m
|
327.8m
| Ensign 50 | 31/03/12 |
09/04/2012
1169.3m C&S CSG
|
RM12-06 3 30.0% | CSG Development | PL314 Bowen Basin |
26°28'17.4"S
149°2'7.6"E
|
GL 323.1m
|
327.2m
| Ensign 50 | 19/04/12 |
27/04/2012
1168.7m C&S CSG
|
RM12-06 4 30.0% | CSG Development | PL314 Bowen Basin |
26°28'17.2"S
149°2'7.6"E
|
GL 322.8m
|
327.1m
| Ensign 50 | 28/04/12 |
05/05/2012
1145m C&S CSG
|
RM12-10 1 30.0% | CSG Development | PL314 Bowen Basin |
26°29'.5"S
149°1'18.5"E
|
GL 341.1m
|
345.3m
| Lucas 26 | 26/03/12 |
02/04/2012
1123m C&S CSG
|
RM12-10 2 30.0% | CSG Development | PL314 Bowen Basin |
26°29'.4"S
149°1'18.2"E
|
GL 341.1m
|
345.4m
| Lucas 26 | 17/03/12 |
23/03/2012
1098m C&S CSG
|
RM12-10 3 30.0% | CSG Development | PL314 Bowen Basin |
26°29'.4"S
149°1'17.9"E
|
GL 341.2m
|
345.5m
| Lucas 26 | 08/03/12 |
15/03/2012
1109m C&S CSG
|
RM12-10 4 30.0% | CSG Development | PL314 Bowen Basin |
26°29'.4"S
149°1'17.6"E
|
GL 341.3m
|
345.5m
| Lucas 26 | 25/02/12 |
06/03/2012
1077m C&S CSG
|
RM13-09 2 30.0% | CSG Development | PL315 Bowen Basin |
26°29'30.6"S
149°5'45.4"E
|
GL 361.1m
|
365.3m
| Lucas 26 | 05/01/12 |
13/01/2012
1127.5m C&S CSG
|
Sangu 11ST1 100% | Gas Development | Block 16PSC, Sangu Gas Field, Tertiary Basin, Offshore Bangladesh |
22°0'56"N
91°31'28.9"E
|
WD 11.6m
|
49.4m
| Offshore Resolute | 04/01/12 |
In progress
|
South Sangu 4 100% | Gas Development | Block 16PSC, Sangu Gas Field, Tertiary Basin, Offshore Bangladesh |
21°59'26.9"N
91°33'31.6"E
|
WD 11.3m
|
32.8m
| Offshore Resolute | 23/09/11 |
In progress
|
Stag 40H WIST1 66.67% | Water Injector | WA-15-L, Carnarvon Basin |
20°17'24.1"S
116°14'45.9"E
|
WD 48.0m
|
38.5m
| Ensco 104 | 27/11/11 |
In progress
|
Stag 41 66.67% | Oil Appraisal | WA-15-L, Carnarvon Basin |
20°17'8.2"S
116°16'57.7"E
|
WD 49.0m
|
62.0m
| Ensco 104 | 07/02/12 |
In progress
|
Stag 42 66.67% | Oil Appraisal | WA-15-L, Carnarvon Basin |
20°17'1.6"S
116°17'41.7"E
|
WD 49.0m
|
62.0m
| Ensco 104 | 13/02/12 |
In progress
|
Stag 43H 66.67% | Oil Development | WA-15-L, Carnarvon Basin |
20°17'23.9"S
116°16'31.1"E
|
WD 49.0m
|
62.0m
| Ensco 104 | 02/01/12 |
In progress
|
Tardrum 4 50.00% | CSG Appraisal Corehole | ATP685P Bowen Basin |
25°32'5"S
150°7'4.3"E
|
GL 246m
|
250.4m
| Atlas 3 | 05/01/12 |
22/01/2012
1606m C&S CSG
|
Tindilpie 10 66.6% | Gas Development | PPL 140 Cooper Basin |
27°52'6.9"S
139°54'54.6"E
|
GL 107'
|
124'
| Ensign 18 | 21/04/09 |
In progress
10543' C&S gas well
|
Tindilpie 13 66.6% | Gas Dev | PPL95 Cooper Basin |
27°51'54.3"S
139°53'58.7"E
|
GL 99.0'
|
116.4'
| Saxon 183 | 15/01/12 |
05/02/2012
10556' C&S gas well
|
Tindilpie 14 66.6% | Gas Dev | PPL95 Cooper Basin |
27°51'54.6"S
139°53'58.6"E
|
GL 99.0'
|
116.5'
| Saxon 183 | 07/02/12 |
03/03/2012
10789' C&S gas well
|
Tindilpie 15 66.6% | Gas Dev | PPL95 Cooper Basin |
27°51'54.9"S
139°53'58.6"E
|
GL 99.0'
|
116.5'
| Saxon 183 | 17/03/12 |
04/04/2012
10563' C&S gas well
|
Tindilpie 16 66.6% | Gas Dev | PPL95 Cooper Basin |
27°51'55.3"S
139°53'58.6"E
|
GL 98.9'
|
116.4'
| Saxon 183 | 05/04/12 |
25/04/2012
11060' C&S gas well
|
Tindilpie 17 66.6% | Gas Dev | PPL95 Cooper Basin |
27°51'55.6"S
139°53'58.6"E
|
GL 98.8'
|
116.3'
| Saxon 183 | 26/04/12 |
In progress
10728'
|
Wortel 3 45% | Gas Development | Sampang PSC, Offshore Indonesia, Madura Straits |
7°17'1.8"S
113°17'56.1"E
|
WD 44.5m
|
33.7m
| COSL BOSS | 07/11/11 |
In progress
|
Wortel 4 45% | Gas Development | Sampang PSC, Offshore Indonesia, Madura Straits |
7°17'1.8"S
113°17'56.1"E
|
WD 44.5m
|
33.7m
| COSL BOSS | 07/11/11 |
In progress
|