Timor Gap
The Timor Gap is located in coastal waters north of Australia.
Santos has non-operated interests in four production licences, which contain gas, condensate and LPG production from Bayu-Undan and LNG production from Darwin LNG.
The Bayu-Undan field came on line in 2004 and LNG production at the Darwin LNG plant began in 2006. Capacity at the Darwin LNG plant is 3.6 million tonnes per annum. 
Download Timor Gap location map (52 kb)